Sunrise over the pond at Lovehayne

Lovehayne · Sustainability · 2023–2026

People and nature, living in harmony

Three years in: the first major milestone of our masterplan

Three years of progress

The numbers so far

~28

Enough clean power for ~28 homes

76 MWh of solar a year

Zero oil

Heat pumps in every building

8,500 L of heating oil a year removed

1.75×

We make 1.75x the electricity we use

108.9 MWh exported to the grid

¾ less

Carbon footprint cut by about three-quarters

35.2 t in 2024 down to ~7–9 t CO₂e a year

Walking through the bluebell woods at Lovehayne

12–16×

Our woods absorb 12–16x what we emit

~25 ha of woodland, about 36 football pitches, absorbing ~115 t CO₂e a year

Morning mist over the fields at Lovehayne

~20,000t

of carbon stored in the land

CO₂e held in our woods, hedges and soils (estimated)

The stream running through Lovehayne

100%

of our water from our own well

Sensors monitor level and flow and detect leaks

~255kWh

of battery storage

Including EVs that charge both ways

Solar panels on the farm roofs at Lovehayne, seen from above
The battery storage system at Lovehayne

How it works

Becoming a centre of excellence for sustainability and regenerative farming

We have installed solar panels with battery storage. That sunshine now powers heat pumps for all our heating and hot water.

We continue to electrify our vehicles and machinery, and to fine-tune how the whole system works together.

What’s next

Phase 2 of the masterplan

Phase 1 laid the foundations. Phase 2 turns to:

Waste and water

Nature

Access

Education

Figures metered or estimated, 2023–2026.